The Challenge
The extensive floor areas and surrounding steel structure required reinforcement to be installed accurately around columns, openings, edges and service penetrations while coordinating with ongoing construction activities.
Murataj Ltd delivered steel fixing works for the development at Ashington College, installing reinforcement across substantial structural floor areas within the building’s steel frame.
The works required the accurate positioning and securing of reinforcement around columns, supporting structures, openings and service penetrations. Careful coordination with other site activities helped prepare each area for concrete placement while maintaining quality, safety and programme requirements.
The extensive floor areas and surrounding steel structure required reinforcement to be installed accurately around columns, openings, edges and service penetrations while coordinating with ongoing construction activities.
Our team systematically positioned, secured and checked the reinforcement across each working area. Close attention was given to structural details and interfaces to ensure the slabs were properly prepared for concrete placement.
Large structural floor areas were successfully reinforced and prepared for the next stage of concrete construction, with the works delivered safely and to the required quality standards.